Aargh! Typepad, Chrome and BT have all conspired to lose my post. Second time around.
I had a fairly productive June.
BLOG
FINISH
2 After the Rain jumper - done
3 Self striping socks - done
4 Quick Sand II cardigan - done
START
5 Chance of Showers cardigan - donem except I changed my mind and have cast on Sandshore instead
6 TSS Talisman shawl - done
7 Stitchnerds I'm the Boss cowl -done
8 Baby cardigan - done
9 Baby vest - not done
I did quite well! The baby vest wasn't even started, but I'd forgotten that this was on my list! I've finished the baby cardigan and the cowl too.
I'm tempted to make a long list for July but shall refrain. Those KALs on various ravelry groups look applealing!I've not thought of the ravelenic Games yet, either,
JULY KNITTING PLANS
BLOG
1 Self Striping socks
2 Baby cardigan, Entrechat
FINISH
3 TSS Talisman Shawl, 70% done!
4 Sandshore cardigan (Bamboo Tape, do-able)
START AND FINISH
5 That baby vest I didn't start in June
6 Stitchnerds Cowl, trying to knit through the pattern library stash
START (finishing would be a plus)
7 TSS shawl #2, out sometime in July. This one needs more yardage than the usual single skein shawls, so Ill have to use two colours. Not sure, until I see the sample shawls, if coordinating or contrasting colours will work. It's not striped, but possibly will have a lace border which would suit a second colour.
8 Some Scrap ball socks for me. MrC has declared that he only wants socks which wear like iron, can be machine washed and tumble dried (for when he forgets and shrinks some) so this means more socks are for ME.
That's it. It seems like quite a short knitting list. Famous last workds!